Scheduling to minimize the total resource consumption with a constraint on the sum of completion times

被引:0
|
作者
Washington Univ, St Louis, United States [1 ]
机构
来源
Eur J Oper Res | / 2卷 / 381-388期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Scheduling
引用
收藏
相关论文
共 50 条
  • [21] Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times
    Fondrevelle, J.
    Oulamara, A.
    Portmann, M. -C.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) : 168 - 176
  • [22] Scheduling Unit Jobs with a Common Deadline to Minimize the Sum of Weighted Completion Times and Rejection Penalties
    Domanic, Nevzat Onur
    Plaxton, C. Gregory
    ALGORITHMS AND COMPUTATION, ISAAC 2014, 2014, 8889 : 646 - 657
  • [23] Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
    Cheng, T. C. E.
    Lin, B. M. T.
    Tian, Y.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) : 3031 - 3040
  • [24] Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
    Mellouli, Racem
    Sadfi, Cherif
    Chu, Chengbin
    Kacem, Imed
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 197 (03) : 1150 - 1165
  • [25] MINIMIZING THE SUM OF COMPLETION TIMES WITH RESOURCE DEPENDANT TIMES
    Yedidsion, Liron
    Shabtay, Dvir
    Kaspi, Moshe
    INTERNATIONAL CONFERENCE ON POWER CONTROL AND OPTIMIZATION, 2008, 1052 : 292 - 297
  • [26] Flowshop scheduling problem to minimize total completion time with random and bounded processing times
    Sotskov, YN
    Allahverdi, A
    Lai, TC
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (03) : 277 - 286
  • [27] Single machine scheduling of deteriorating jobs to minimize total absolute differences in completion times
    Li, Yongqiang
    Li, Gang
    Sun, Linyan
    Xu, Zhiyong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (02) : 424 - 429
  • [28] Scheduling with Resource Allocation, Deteriorating Effect and Group Technology to Minimize Total Completion Time
    Yan, Jia-Xuan
    Ren, Na
    Bei, Hong-Bin
    Bao, Han
    Wang, Ji-Bo
    MATHEMATICS, 2022, 10 (16)
  • [29] OPERATION RESEARCH STATISTICS AND ECONOMICS .286. OPENSHOP AND FLOWSHOP SCHEDULING TO MINIMIZE SUM OF COMPLETION TIMES
    ADIRI, I
    AMIT, N
    COMPUTERS & OPERATIONS RESEARCH, 1984, 11 (03) : 275 - 284
  • [30] The two-stage assembly scheduling problem to minimize total completion time with setup times
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (10) : 2740 - 2747