共 14 条
- [2] WHO WILL FOOT THE BILL FOR REBUILDING THE U. S. INFRASTRUCTURE? Professional engineer Washington, 1982, 52 (04): : 23 - 26
- [4] U. S. RESPONSE TO COAL DEMAND: PORT AND HARBOR IMPROVEMENTS. Civil engineering New York, N.Y., 1982, 52 (04): : 53 - 57
- [5] ELECTRIC PLANT SUPERVISORY CONTROL SYSTEM ABOARD U. S. S. OLIVER HAZARD PERRY GUIDED MISSILE FRIGATE. 1982, V IA-18 (N 5): : 573 - 577
- [8] Exploration Results in the 10th Five Year Plan Period and Prospects for Oil and Gas Production in the 11th FYP Period in the Caspian Sea. Geologia nefti i gaza, 1981, (12): : 7 - 11
- [9] WAVE INFORMATION STUDY FOR U. S. COASTLINES - 1. SURFACE PRESSURE FIELD RECONSTRUCTION FOR WAVE HINDCASTING PURPOSES. Technical Report - US Army Engineer Waterways Experiment Station, 1980, (HL-80-11):
- [10] HYDROLOGIC AND GEOLOGIC ASPECTS OF WASTE MANAGEMENT AND DISPOSAL: A BIBLIOGRAPHY OF PUBLICATIONS BY U. S. GEOLOGICAL SURVEY AUTHORS, 1950-81. US Geological Survey Circular, 1983,