NEW CAPACITY AND PROBLEMS ASSOCIATED WITH NEW MINES.

被引:0
|
作者
Wood, J.E.
Eaton, W.M.
机构
来源
Mining Technology | 1980年 / 62卷 / 718期
关键词
D O I
暂无
中图分类号
TD [矿业工程]; P61 [矿床学];
学科分类号
0709 ; 081803 ; 0819 ;
摘要
Two of the National Coal Board's largest projects currently in progress are Thorne and Selby. Their engineering problems and solutions are analyzed.
引用
收藏
页码:409 / 418
相关论文
共 50 条
  • [1] NEW MINES.
    Rhodes, Ernest
    Mining Technology, 1987, 69 (802): : 245 - 246
  • [2] ENGINEERING REQUIREMENTS FOR NEW MINES.
    Blelloch, J.D.
    Mining Engineer London, 1980, 140 (226): : 29 - 46
  • [3] FINANCING TO START NEW MINES.
    Anon
    World mining equipment, 1984, 8 (10): : 21 - 22
  • [4] NEW TECHNOLOGY FOR LARGE SURFACE MINES.
    Singhal, Raj K.
    1600, (188):
  • [5] DIESELS BOOST OUTPUT AT NEW MINES.
    Jackson, Dan
    Brezovec, David
    Coal age, 1980, 85 (09): : 98 - 109
  • [6] FACE AND DRIVAGE TECHNIQUES FOR NEW MINES.
    Harris, L.
    Mining Engineer London, 1979, 139 (217): : 313 - 320
  • [7] MATERIALS PROBLEMS IN UNDERWATER MINES.
    Johnston, Jack L.
    1600, (96):
  • [8] NEW HOISTS MODERNIZE JIM WALTER MINES.
    Anon
    Coal Mining & Processing, 1979, 16 (07): : 108 - 109
  • [9] NEW ELECTRIC TRUCK SYSTEM FOR UNDERGROUND MINES.
    Wyllie, Robert J.M.
    White, Lane
    Engineering and Mining Journal, 1985, 186 (11): : 91 - 92
  • [10] GEOCHEMICAL INVESTIGATIONS FOR NEW UNDERGROUND COAL MINES.
    Rozier, I.T.
    Coal miner Vancouver, 1981, 6 (05):