Drillers push towards 10 km lateral goal

被引:0
|
作者
机构
来源
Offshore | / 56卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Reaching towards the 10 km barrier
    BP Exploration
    Journal of Offshore Technology, 1997, 5 (01): : 35 - 37
  • [2] Get deep-cheap goal of new drillers
    Offshore, 58 (04):
  • [3] Push single-goal agency
    Kolker, R
    AVIATION WEEK & SPACE TECHNOLOGY, 1998, 149 (15): : 6 - 6
  • [4] DRILLERS TRAINING GUIDEBOOK .10. RECORDS AND REPORTS
    BERKHOLT.R
    GROUND WATER AGE, 1970, 4 (10): : 36 - &
  • [5] Towards the goal
    Schmied-Wolfsbauer, Manuela
    Galvanotechnik, 2024, 115 (06): : 775 - 777
  • [6] The push towards efficiency
    Operations Engineer, 2024, (07): : 12 - 13
  • [7] The push towards the future
    Novotny, Radek
    Reuss, Christian
    Glass International, 2024, 47 (06): : 27 - 28
  • [8] SOVIETS PUSH TO REACH 1975 SUGARBEET GOAL
    BERNSTEIN, LA
    FOREIGN AGRICULTURE, 1975, 13 (43): : 12 - 12
  • [9] SPI certification push reaches a first goal
    不详
    MODERN PLASTICS, 1997, 74 (12): : 15 - 15
  • [10] Knowledge Seeking in KM - Towards an Adapted KM Cycle
    Lai, Han
    Graham, Margaret
    PROCEEDINGS OF THE 10TH EUROPEAN CONFERENCE ON KNOWLEDGE MANAGEMENT , VOLS 1 AND 2, 2009, : 466 - 473