共 50 条
- [41] Methods for the implementation of automatic reclosing on combined overhead and underground cable power lines 110-500 kV PRZEGLAD ELEKTROTECHNICZNY, 2022, 98 (07): : 50 - 55
- [43] The interest of the new 400 kV lines and power plants for the southwest of Algeria PROCEEDINGS OF 2019 ALGERIAN LARGE ELECTRICAL NETWORK CONFERENCE (CAGRE), 2019, : 6 - 10
- [45] Lightning Protection of Overhead Lines Rated at 3-35 kV and Above With the Help of Multi-Chamber Arresters and Insulator-Arresters 2010 ASIA-PACIFIC INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY & TECHNICAL EXHIBITION ON EMC RF/MICROWAVE MEASUREMENTS & INSTRUMENTATION, 2010, : 1247 - 1250
- [47] MICROWAVE REPEATER POWER-SUPPLY TAPPED FROM THE OVERHEAD GROUND WIRE ON 735 KV TRANSMISSION-LINES IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1980, 99 (01): : 183 - 184
- [48] The Results of Power Grid Research Modes in Case of 6-10 kV Overhead Lines Phase Wire Breakage 2017 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, APPLICATIONS AND MANUFACTURING (ICIEAM), 2017,
- [49] 380-KV POWER-LINES OF BAYERNWERK-AG EXEMPLIFY DEVELOPMENT OF OVERHEAD LINE CONSTRUCTION IN GERMANY SIEMENS REVIEW, 1978, 45 (10): : 443 - 448
- [50] Effect of power frequency electric field of 550 kV overhead transmission lines on ship in the permanent gate of Sanxia Station Gaodianya Jishu/High Voltage Engineering, 2001, 27 (03):