共 50 条
- [21] FIRE-FIGHTING MEDIA ASSOCIATED WITH OFFSHORE INSTALLATIONS. [J]. ACS Symposium Series, 1978, : 179 - 204
- [22] Supply Installations for Coolant and Lubricant Filter Systems. Central Coolant Cleaning Installations. [J]. Werkstatt und Betrieb, 1973, 106 (08): : 609 - 614
- [23] WEIGHT CONTROL IN CONTINUOUS EXTRUSION BLOW MOULDING INSTALLATIONS. [J]. Kunststoffe - German Plastics, 1980, 70 (09): : 2 - 3
- [25] ESTIMATING THE COSTS AND BENEFITS AND MONITORING THE EFFECTIVENESS OF LARGE GOVERNMENT INSTALLATIONS. [J]. 1974, : 181 - 190
- [26] Support of Technical Service Keeping in Operation Microcomputer Controlled Installations. [J]. Fernmeldetechnik Berlin, 1982, 22 (06): : 221 - 224
- [28] GAS DEHYDRATION: FINE-TUNING EXISTING FIELD INSTALLATIONS. [J]. World Oil, 1981, 192 (02) : 75 - 84
- [29] Load Control in Operational Systems of Time-Sharing Installations. [J]. Elektronische Rechenanlagen mit Computer Praxis, 1979, 21 (03): : 120 - 125
- [30] Modern Nuclear Reactor Installations. A Report on the Nuclex '72 in Basel. [J]. 1600, (19): : 1 - 2