Tests of a 300-MW two-boiler single-turbine power unit with a TGMP-114 boiler when starting with a sliding pressure throughout the water-steam circuit

被引:0
|
作者
Glusker, B.N.
Kalinitchev, V.M.
Shcheptev, V.A.
Garnov, G.V.
Taran, O.E.
Platov, A.I.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 6 条
  • [1] Tests of a 300-MW Two-Boiler Single-Turbine Power Unit with a TGMP-114 Boiler when Starting with a Sliding Pressure Throughout the Water-Steam Circuit
    Entpr. Pwr. Stn. Maintenance, Kostromskya District Power Station, Semenovskii per. 15, Moscow 105023, Russia
    Therm Eng, 12 (1028-1033):
  • [2] Investigating the starting modes of a 300 MW power generating unit with a TGMP-114 boiler and rated feedwater flowrate reduced to 20%
    Prokopenko, A.G.
    Mysak, I.S.
    Leonkov, A.M.
    Kuskov, I.A.
    Gerasimov, V.V.
    Zankovich, V.L.
    Zhadzilko, M.I.
    Miron, D.T.
    Thermal Engineering (English translation of Teploenergetika), 1988, 35 (05): : 270 - 273
  • [3] Investigating the starting modes of the 300-MW power unit at the Kashira district power station at sliding pressure in the entire steam-water path of its TGMP-314 boiler
    Shvarts A.L.
    Gombolevskii V.I.
    Chugreev A.A.
    Skuratov A.V.
    Konovalov V.K.
    Yashkin O.V.
    Therm Eng, 2008, 9 (719-724): : 719 - 724
  • [4] INVESTIGATING THE STARTING MODES OF A 300-MW POWER GENERATING-UNIT WITH A TGMP-114 BOILER AND RATED FEEDWATER FLOW-RATE REDUCED TO 20-PERCENT
    PROKOPENKO, AG
    MYSAK, IS
    LEONKOV, AM
    KUSKOV, IA
    GERASIMOV, VV
    ZANKOVICH, VL
    ZHADZILKO, MI
    MIRON, DT
    THERMAL ENGINEERING, 1988, 35 (05) : 270 - 273
  • [5] Investigations of starting TPP-804 boilers for a 800-MW power unit with a sliding pressure throughout the water-steam circuit
    Shvarts, A.L.
    Glusker, B.N.
    Dyadichenko, A.A.
    Sokolov, A.D.
    Serebryanskii, S.S.
    Nosov, B.N.
    Kolbasnikov, A.B.
    Belyakov, I.I.
    Kvetnyi, M.A.
    Posrednik, V.A.
    Rudyka, A.V.
    Thermal Engineering (English translation of Teploenergetika), 1996, 43 (01):
  • [6] Experience gained from automation of starting operations in a 200-MW Two-Boiler Single-Turbine Power Unit Equipped with Once-Through Coal-Fired Boilers
    Baranov V.N.
    Ginzburg L.N.
    Gorskii E.R.
    Romanchuk I.F.
    Rul'Kovskii V.F.
    Rul'Kovskii A.V.
    Thermal Engineering, 2011, 58 (10) : 829 - 839