摘要
It has been normal practice to plan a project through the engineering procurement and construction phases to a designated 'mechanical completion' on a fundamentally geographic basis. Then, during the 3-12 months before 'mechanical completion' (longer periods are required for larger plants) a commissioning team is set up at the site to carry out precommissioning, followed by commissioning and start-up. During these three last activities the team involvement increases from a monitoring role to 100% control including the whole of the start-up phase. These final stages normally occur simultaneously in several areas of the plant. Progress, however, is limited by the state of completion of the many areas of construction in which site contractors are still engaged and the safety aspects encountered in allowing commissioning activities to be carried out in the proximity of construction activities.
引用
收藏
页码:47 / 48
相关论文
共 50 条
  • [1] FIFE ETHYLENE: COUNTDOWN TO COMPLETION.
    Tayler, Clive
    Process Engineering (London), 1984, 65 (07):
  • [2] On a variational theory of image amodal completion.
    Masnou, Simon
    Morel, Jean-Michel
    RENDICONTI DEL SEMINARIO MATEMATICO DELLA UNIVERSITA DI PADOVA, 2006, 116 : 211 - 252
  • [3] NEW DEVELOPMENTS IN THERMAL WELL COMPLETION.
    Buyken, Klaus-Peter
    Goetzen, P.
    Oil Gas European Magazine, 1988, 14 (01): : 24 - 28
  • [4] Adaptive confidence sets for matrix completion.
    Carpentier, Alexandra
    Klopp, Olga
    Loeffler, Matthias
    Nickl, Richard
    BERNOULLI, 2018, 24 (4A) : 2429 - 2460
  • [5] Bottom Hole Designs During Well Completion.
    Ashraf'yan, M.O.
    Lebedev, O.A.
    Oil Industry, 1979, (06): : 27 - 31
  • [6] End of life care and MOLST completion.
    Olden, A.
    Quill, T.
    Ladwig, S.
    JOURNAL OF THE AMERICAN GERIATRICS SOCIETY, 2007, 55 (04) : S159 - S160
  • [7] TECHNOLOGY AIDS DEEP-WELL COMPLETION.
    Bleakley, W.B.
    Petroleum Engineer International, 1982, 54 (05): : 32 - 46
  • [8] WELL COMPLETION AND WORKOVER - 3. SELECTING THE BEST WELL COMPLETION.
    Patton, L.Douglas
    Abbott, William A.
    Petroleum Engineer International, 1979, 51 (07): : 64 - 74
  • [9] OPEN-OCEAN BARRIER NEAR COMPLETION.
    Abrahams, Richard N.
    Koburger Jr., Charles W.
    Oil and Gas Journal, 1974, 72 (16): : 103 - 104
  • [10] PLANT EXPANSION BEGINS OPERATION BEFORE COMPLETION.
    Battenfield, Teresa
    Thompson, William B.
    Public Works, 1987, 118 (02): : 47 - 49