IN-THE-HOLE DRILLING AT HEATH STEELE MINES LIMITED.

被引:0
|
作者
Ladner, Errol A.
机构
来源
Transactions of the Canadian Institute of Mining and Metallurgy and of the Mining Society of Nova Scotia | 1979年 / 82卷
关键词
D O I
暂无
中图分类号
TD [矿业工程]; P61 [矿床学];
学科分类号
0709 ; 081803 ; 0819 ;
摘要
This paper deals with drilling with conventional percussion longhole drills and the changeover to accommodate larger blastholes in underground operations. The discussion includes layouts for 2-inch-diameter blasthole stope blocks, 6-inch-diameter stope blocks, trials for stope rooms, and drill patterns, drilling and performance.
引用
收藏
页码:169 / 175
相关论文
共 24 条
  • [21] Numerical simulation and analysis of drill rods vibration during roof bolt hole drilling in underground mines
    Liu, Shaowei
    Fu, Mengxiong
    Jia, Housheng
    Li, Wenbin
    Luo, Yafei
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (06) : 877 - 884
  • [22] Numerical simulation and analysis of drill rods vibration during roof bolt hole drilling in underground mines
    Shaowei Liu
    Mengxiong Fu
    Housheng Jia
    Wenbin Li
    Yafei Luo
    InternationalJournalofMiningScienceandTechnology, 2018, 28 (06) : 877 - 884
  • [23] BIG-HOLE BLASTHOLE DRILLING AT INTERNATIONAL-NICKEL-COMPANY-OF-CANADA-LIMITED
    BERTRIM, G
    CIM BULLETIN, 1975, 68 (753): : 25 - 26
  • [24] Use of Microelectronics for the Control and Optimization of Drilling Process in Ore Mines Based on the Example of Large Hole Boring.
    Grober, Klaus-Peter
    Goutier, Wolfgang
    Baldauf, Dieter
    Neue Bergbautechnik, 1984, 14 (09): : 334 - 336