Not your conventional bridge deck replacement

被引:0
作者
机构
来源
Public Works | / 1卷 / 58-59期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
[31]   PRECAST CONCRETE DECK MODULES FOR BRIDGE DECK RECONSTRUCTION [J].
SLAVIS, C .
JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1983, 28 (04) :120-135
[32]   Quantification of force re-distribution during deck replacement in a cable-stayed bridge [J].
Chandra, D .
COMPUTERS & STRUCTURES, 2003, 81 (21) :2067-2078
[33]   Study on the Precise Displacement Controlling Method for a Suspended Deck in the Hanger Replacement Process of an Arch Bridge [J].
Wang, Hua ;
Wang, Longlin ;
Zhuo, Xiaoli ;
Huang, Kainan ;
Wang, Xirui ;
Wang, Wensheng .
APPLIED SCIENCES-BASEL, 2021, 11 (20)
[34]   GEORGE-WASHINGTON-BRIDGE UPPER DECK REPLACEMENT PORT-AUTHORITY-OF-NY-AND-NJ [J].
BOB, B .
INDUSTRIAL PHOTOGRAPHY, 1979, 28 (09) :36-&
[35]   BRIDGE DECK PREPARATION SIMPLIFIED [J].
GALLAGHER, JW .
PUBLIC WORKS, 1983, 114 (02) :59-60
[36]   PERMANENT BRIDGE DECK REPAIR [J].
CLEAR, K .
PUBLIC ROADS, 1975, 39 (02) :53-62
[37]   Failure of a bridge deck topcoat [J].
Brand, Warren .
Journal of Protective Coatings and Linings, 2016, 33 (11) :22-25
[38]   ALUMINUM ORTHOTROPIC BRIDGE DECK [J].
ROGERSON, WM ;
SHARP, ML ;
STEMLER, JR ;
SOMMER, RJ .
CIVIL ENGINEERING, 1967, 37 (11) :65-&
[39]   Coutts Crossing bridge deck [J].
Anon .
Structural Engineer, 2006, 84 (01)
[40]   FRP reinforcement in bridge deck [J].
West Virginia Univ, Morgantown, United States .
Concr Int, 6 (47-50)