OPERATION OF 750 kv LINES WITH DECREASED NUMBER OF SHUNTING REACTORS.

被引:0
|
作者
Belyakov, N.N.
Lokhanina, N.I.
Rashkes, V.S.
机构
来源
Soviet power engineering | 1982年 / 11卷 / 08期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
ELECTRIC POWER SYSTEMS - Protection
引用
收藏
页码:634 / 641
相关论文
共 50 条
  • [31] SINGLE-PHASE AUTO-RECLOSING ON 750-KV TRANSMISSIONS WITH SHUNT REACTORS
    BELYAKOV, NN
    BURGSDORF, VV
    RASHKES, VS
    KHOETSIAN, KV
    ELECTRICAL TECHNOLOGY, 1981, (03): : 14 - 27
  • [32] THE SHOCK RECORD FOR 500-KV AND 750-KV TRANSMISSION-LINES IN NORTH-AMERICA
    GLASGOW, AR
    CARSTENSEN, EL
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (02): : 559 - 562
  • [33] Control of Corrosion State of Structural Materials in the Course of Operation of Nuclear Power Plants with Boiling Water Reactors.
    Gerasimov, V.V.
    Gromova, A.I.
    Belous, V.N.
    Shut'ko, V.N.
    Varovin, I.A.
    Zakharzhevskii, Yu.O.
    Gosteva, V.A.
    Teploenergetika, 1977, (12): : 7 - 10
  • [34] Increasing the reliability of the shutdown of 500-750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle
    Kuz'Micheva K.I.
    Merzlyakov A.S.
    Fokin G.G.
    Power Technology and Engineering, 2013, 47 (01) : 71 - 75
  • [35] Review of modeling experience during operation and decommissioning of RBMK-1500 reactors. I. Safety improvement studies during operation
    Remeikis, V.
    Grineviciute, J.
    Duskesas, G.
    Juodis, L.
    Plukiene, R.
    Plukis, A.
    NUCLEAR ENGINEERING AND DESIGN, 2021, 380
  • [36] Model and algorithm for taking out and placing in wagons in shunting operation on radial private lines
    Mu F.
    Wang C.
    Zuo D.
    Zhang Z.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2010, 45 (01): : 104 - 110+123
  • [37] Influence factors and reasonable arrangement of corridor width of ±800 kV HVDC and 750 kV HVAC hybrid transmission lines
    Zhang, Qian
    Li, Yinfei
    Li, Xuebao
    Lu, Tiebing
    JOURNAL OF ENGINEERING-JOE, 2019, (16): : 2539 - 2543
  • [38] Derivation of an enhanced Sherwood number accounting for reaction rate in membrane reactors. Steam reforming of methane as case study
    Murmura, M. A.
    Cerbelli, S.
    Annesini, M. C.
    Sheintuch, M.
    CATALYSIS TODAY, 2021, 364 : 285 - 293
  • [39] 750 KV TRANSMISSION-LINE WINNIZA - SAPADNOUKRAINSKAJA (USSR) - ALBERTIRSA (HUNGARY) PUT INTO OPERATION
    NIKOLAJEW, WA
    MANKHER, E
    MEHES, C
    ENERGIETECHNIK, 1980, 30 (06): : 203 - 204
  • [40] Switchings in the 110-750 kV electric networks in incomplete-phase modes of operation
    Maksimov V.V.
    Maksimov V.M.
    Power Technology and Engineering, 2013, Springer Science and Business Media, LLC (47) : 222 - 225