Improving the structure of the power industry by gradual introduction of combined-cycle plant with 800 mw steam turbines
被引:0
作者
:
Prutkovskii, E.N.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Prutkovskii, E.N.
[
1
]
Safonov, L.P.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Safonov, L.P.
[
1
]
Levchenko, G.I.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Levchenko, G.I.
[
1
]
Glukhikh, V.K.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Glukhikh, V.K.
[
1
]
Tarasov, E.A.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Tarasov, E.A.
[
1
]
Stepnii, D.M.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Stepnii, D.M.
[
1
]
Matvienko, S.A.
论文数:
0
引用数:
0
h-index:
0
机构:
Central Boiler-Turbine Inst (TsKTI)
Central Boiler-Turbine Inst (TsKTI)
Matvienko, S.A.
[
1
]
机构
:
[1]
Central Boiler-Turbine Inst (TsKTI)
来源
:
Thermal Engineering (English translation of Teploenergetika)
|
1990年
/ 37卷
/ 03期
关键词
:
Capital Costs - Low Head Steam Generator - Thermal Power Stations;
D O I
:
暂无
中图分类号
:
学科分类号
:
摘要
:
引用
收藏
页码:120 / 126
相关论文
未找到相关数据