共 50 条
- [21] STRAIN BEHAVIOUR OF A PRESTRESSED CONCRETE REACTOR PRESSURE VESSEL AFTER 12 YEARS OPERATION. Transactions of the International Conference on Structural Mechanics in Reactor Technology, 1979, H.
- [22] CENTAUR GAS TURBINE MODIFICATION AND DEVELOPMENT FOR SOLAR-FOSSIL HYBRID OPERATION. Electric Power Research Institute, Advanced Power Systems Division, (Report) EPRI AP, 1982,
- [23] DEVELOPMENT OF MITSUBISHI SINGLE POINT MOORING (SPM) SYSTEMFOR OPEN SEA OPERATION. 1982, V 19 (N 2): : 136 - 148
- [24] KEYS TO OPTIMUM POWER PUMP OPERATION. Plant Engineering (Barrington, Illinois), 1976, 30 (25): : 171 - 173
- [27] SIMULATIONS PROVIDE BLUEPRINT FOR DISTILLATION OPERATION. Chemical Engineering (New York), 1976, 83 (12): : 131 - 138
- [30] ELIMINATION OF THE NORMAL PARTIAL STORE OPERATION. IBM Technical Disclosure Bulletin, 1973, 16 (05):