共 50 条
- [41] Effect of the Pulverized Fuel Preparation System on Superheater Operation. 1978, (08): : 38 - 39
- [42] Effect of the Ash Content in Coke Consumption and Performance of a Blast Furnace on the Basis of Data Obtained from Industrial Operation. Hutnik, 1979, 46 (05): : 194 - 197
- [46] ROSARIO DOMINICANA'S CYANIDE TAILINGS DAM CONSTRUCTION AND OPERATION. ASTM Special Technical Publication, 1980,
- [47] BURDEN TESTING AND ITS APPLICATION TO BLAST-FURNACE OPERATION. Journal of the Iron and Steel Institute (London), 1973, 211 (Part 2): : 106 - 114
- [48] IDENTIFICATION OF ROCK FOUNDATION DEFORMABILITY OF A LARGE ARCH DAM IN OPERATION. Buletinul Stiintific - Institutul de Constructii, Bucuresti, 1981, 24 (1-2): : 45 - 64
- [49] MULTIPLEXED INFORMATION AND CONTROL SYSTEM FOR AN MSV: CONFIGURATION, INSTALLATION, AND OPERATION. Proceedings of the Annual Offshore Technology Conference, 1980, 2 : 181 - 189
- [50] EVAPORATIVE COOLING OF POWER CABLES - PREDICTION OF STEADY STATE OPERATION. SAE Preprints, 1981,