共 50 条
- [41] Improving Productivity on a Troubled Bridge Project JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (05): : 364 - 371
- [47] THE TEMPORAL PLAN GAME EUROPEAN INTEGRATION: BETWEEN TRADITION AND MODERNITY, VOL 1, 2005, : 556 - 561
- [49] The facilities plan and project management based on the optimize correlation of logistics and production construction AUTOMATIC MANUFACTURING SYSTEMS II, PTS 1 AND 2, 2012, 542-543 : 339 - 343
- [50] Implementing a waste management plan during the construction phase of a project: A case study Construction Management and Economics, 1998, 16 (01): : 71 - 78