共 50 条
- [2] Reconstruction and analysis on gland sealing system of 300 MW steam turbine 2002, Harbin Steam Turbine Company (44):
- [3] Study of reliability growth rule for licensed 300 MW steam turbines Dongli Gongcheng/Power Engineering, 2001, 21 (04):
- [5] Analysis of the 300MW steam turbine rotor's transient temperature Qilunji Jishu/Turbine Technology, 2003, 45 (05):
- [6] Economics Analysis of Retrofit of Flow Passage of a 300MW Steam Turbine 2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
- [7] On effective rapid startup of 300 MW steam turbine unit PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 803 - 808
- [8] Theoretical analysis on the erosion of the low pressure stage blades for a 300MW steam turbine CASE HISTORIES ON INTEGRITY AND FAILURES IN INDUSTRY, 1999, : 803 - 810
- [9] Cause analysis of cracking damage on the second last stage blades of one 300 MW steam turbine Zhongguo Dianli/Electric Power, 2000, 33 (06): : 7 - 10
- [10] Reconstruction of the gland sealing system of a 300MW steam turbine unit ENERGY CONVERSION AND APPLICATION, VOL I AND II, 2001, : 862 - 866