Validation of the model for evaluating client-generated risk by project consultants

被引:0
|
作者
Kometa, S.R.
Olomolaiye, P.O.
Harris, F.C.
机构
来源
Construction Management and Economics | 1996年 / 14卷 / 02期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:131 / 145
相关论文
共 50 条
  • [21] Evaluating Simulation Model Based on Generated Weather Data
    Li, Shijuan
    Zhu, Yeping
    COMPUTER AND COMPUTING TECHNOLOGIES IN AGRICULTURE V, PT III, 2012, 370 : 129 - 135
  • [22] Evaluating effective lawyer-client communication: An international project moving from research to reform
    Cunningham, CD
    FORDHAM LAW REVIEW, 1999, 67 (05) : 1959 - 1986
  • [23] Overview of mineral project risk issues and role of mineral industry professionals (especially consultants) in risk reduction strategies
    Lawrence, MJ
    PACRIM 2004 CONGRESS, 2004, 2004 (05): : 45 - 51
  • [24] The Validation and Modification of the Caprini Risk Assessment Model for Evaluating Venous Thromboembolism after Joint Arthroplasty
    Qiao, Liang
    Yao, Yao
    Wu, Dengxian
    Xu, Ruijuan
    Cai, Honggang
    Shen, Ying
    Xu, Zhihong
    Jiang, Qing
    THROMBOSIS AND HAEMOSTASIS, 2024, 124 (03) : 223 - 235
  • [25] Computer-Generated Comprehensive Risk Assessment for IT Project Management
    Wickboldt, Juliano Araujo
    Bianchin, Luis Armando
    Lunardi, Roben Castagna
    Andreis, Fabricio Girardi
    dos Santos, Ricardo Luis
    Dalmazo, Bruno Lopes
    da Costa Cordeiro, Weverton Luis
    Rabelo de Sousa, Abraham Lincoln
    Granville, Lisandro Zambenedetti
    Gaspary, Luciano Paschoal
    Bartolini, Claudio
    PROCEEDINGS OF THE 2010 IEEE-IFIP NETWORK OPERATIONS AND MANAGEMENT SYMPOSIUM, 2010, : 400 - 407
  • [26] EVALUATING PROJECT ROBUSTNESS THROUGH THE LENS OF THE BUSINESS MODEL
    Reginato, Justin
    INTERNATIONAL JOURNAL OF INNOVATION AND TECHNOLOGY MANAGEMENT, 2009, 6 (02) : 155 - 167
  • [27] Evaluating the quality of project planning: a model and field results
    Zwikael, O
    Globerson, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (08) : 1545 - 1556
  • [28] THE HOUSESTAFF EDUCATION PROJECT - A MODEL FOR EVALUATING RHEUMATOLOGY EDUCATION
    GOLDENBERG, DL
    MEENAN, RF
    MURRMAN, MK
    COHEN, AS
    ARTHRITIS AND RHEUMATISM, 1980, 23 (06): : 681 - 682
  • [29] Evaluating the risk of ovarian cancer before surgery using the ADNEX model: a multicentre external validation study
    Sayasneh, A.
    Ferrara, L.
    De Cock, B.
    Saso, S.
    Al-Memar, M.
    Johnson, S.
    Kaijser, J.
    Carvalho, J.
    Husicka, R.
    Smith, A.
    Stalder, C.
    Blanco, M. C.
    Ettore, G.
    Van Calster, B.
    Timmerman, D.
    Bourne, T.
    BRITISH JOURNAL OF CANCER, 2016, 115 (05) : 542 - 548
  • [30] Evaluating project robustness through the lens of the business model
    Regin, Justin M.
    PICMET '07: PORTLAND INTERNATIONAL CENTER FOR MANAGEMENT OF ENGINEERING AND TECHNOLOGY, VOLS 1-6, PROCEEDINGS: MANAGEMENT OF CONVERGING TECHNOLOGIES, 2007, : 2043 - 2048