共 50 条
- [2] BWR REFILL-REFLOOD PROGRAM - MODEL QUALIFICATION TASK PLAN. Electric Power Research Institute (Report) EPRI NP, 1981,
- [3] BWR REFILL-REFLOOD PROGRAM - SINGLE HEATED BUNDLE EXPERIMENTAL TASK PLAN. Electric Power Research Institute (Report) EPRI NP, 1981, 1 (1524):
- [4] BWR REFILL-REFLOOD PROGRAM - CORE SPRAY DISTRIBUTION EXPERIMENTAL TASK PLAN. Electric Power Research Institute (Report) EPRI NP, 1981, (1523):
- [5] The EuroGOOS Mediterranean Test Case: science and implementation plan. OPERATIONAL OCEANOGRAPHY: THE CHALLENGE FOR EUROPEAN CO-OPERATION, 1997, 62 : 549 - 557
- [6] PROTOTYPE LOCKHOPPER VALVE TESTING AND DEVELOPMENT PROJECT TEST PLAN. US Department of Energy (Report) DOE/MC, 1981,