COMPUTER PROGRAM CONTROLS COMPONENT SEQUENCER COSTS.

被引:0
作者
Richerson, Michael E.
机构
来源
| 1600年 / 19期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
PRINTED CIRCUITS
引用
收藏
相关论文
共 50 条
[31]   7-DAY WORKWEEK COULD LOWER COSTS. [J].
Sullivan, Allanna M. .
Coal age, 1980, 85 (02) :122-136
[32]   Intensification of the Production Process and the Relative Reduction of Net Costs. [J].
Hieke, Hans ;
Neubert, Joachim .
Neue Hutte, 1985, 30 (09) :329-332
[33]   COMPUTER-PROGRAM FOR PREDICTING STEEL HIGHWAY BRIDGE CORROSION COSTS [J].
FRONDISTOUYANNAS, S .
MATERIALS PERFORMANCE, 1981, 20 (11) :16-28
[34]   WORLD'S BIGGEST TANKER, HIGH SAFETY, LOW COSTS. [J].
Anon .
1600, (77)
[35]   Economic Steam Generation Methods for Reducing Steam Generation Costs. [J].
Ernst, Hardy .
Fernwarme international, 1980, 9 (03) :166-169
[36]   SWITCH FROM TRUCKS TO BELT CONVEYOR CUTS OPERATING COSTS. [J].
Robertson, Joseph L. .
1600, (86)
[37]   DIAMOND GRIDDED-DISC CUTS CARBIDE GRINDING COSTS. [J].
Anon .
Cutting Tool Engineering, 1979, 31 (9-10)
[38]   SIMULTANEOUS OD AND ID CUTS REDUCE NC TURNING COSTS. [J].
Anon .
Tooling & Production, 1975, 40 (12) :52-53
[39]   COOLANT SWITCH SLASHES CHICAGO SHOP'S DRILLING/TAPPING COSTS. [J].
ANON .
1982, V 34 (N 9-10) :17-18
[40]   MONTREAL'S XXI OLYMPIAD SPORTS A LAVISH DESIGN AT RECORD COSTS. [J].
Anon .
Engineering News-Record, 1976, 196 (24) :22-24