共 50 条
- [12] Study on Overburden Strata Rupture Development Height Rules in Repeated Mining of Thick Coal Seams PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 279 - +
- [13] PRESSURE CONTROL AND TOP COAL DRAWING BY POWERED MACHINE COMPLEXES IN MINING AT THICK COAL SEAMS GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2008, 24 (04): : 25 - 35
- [14] PRESENT PRACTICE AND DEVELOPMENT TRENDS IN MINING OF THICK COAL SEAMS IN YUGOSLAVIA AND OTHER COUNTRIES WITH SPECIAL REFERENCE TO IMPROVEMENT OF MINING OF LIGNITE MINING AND METALLURGY QUARTERLY, 1967, (02): : 11 - &
- [15] 3 MINING METHODS FOR VERTICAL, INCLINED AND THICK COAL SEAMS USED IN FRANCE CANADIAN MINING AND METALLURGICAL BULLETIN, 1972, 65 (722): : 70 - &
- [16] Key Technology of Safety and Effective Mining in Thick Coal Seams with Dirt Band ADVANCED MANUFACTURING SYSTEMS, PTS 1-3, 2011, 201-203 : 417 - 420
- [18] 3 MINING METHODS FOR VERTICAL INCLINED AND THICK COAL SEAMS USED IN FRANCE CANADIAN MINING AND METALLURGICAL BULLETIN, 1972, 65 (719): : 52 - &
- [20] Pillar drawing in thick coal seams TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1922, 66 : 415 - 421