PRODUCTIVITY MEASUREMENT AND IMPROVEMENT IN THE WIRE AND CABLE INDUSTRY.

被引:0
|
作者
Mann, R.Glenn
机构
来源
Wire journal | 1981年 / 14卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
This article deals with the major areas of emphasis considered of significance in improving productivity at Southwire.
引用
收藏
页码:96 / 99
相关论文
共 50 条
  • [1] D. C. Drives in the Wire and Cable Industry.
    Emilius, Erwin
    Liedke, Joerg
    1978, 52 (06): : 372 - 375
  • [2] PLASTICS IN THE CABLE INDUSTRY.
    Troitskii, I.D.
    1600,
  • [3] The use of simulation and design of experiments for productivity improvement in the sawmill industry.
    Baesler, FF
    Araya, E
    Ramis, FJ
    Sepúlveda, JA
    PROCEEDINGS OF THE 2004 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2004, : 1218 - 1221
  • [4] OVERHEAD MATERIAL HANDLING SYSTEMS INCREASE PRODUCTIVITY AND SAFETY IN THE WIRE INDUSTRY.
    Singh, Paramjit
    Wire Journal International, 1981, 14 (07): : 106 - 111
  • [5] MATERIALS MANAGEMENT IN THE CABLE INDUSTRY.
    Anon
    Wire Journal International, 1986, 19 (06): : 40 - 42
  • [6] Plastics Testing in the Cable Industry.
    Bina, Jaroslav
    Plastvarlden, 1972, 9 (08): : 230 - 232
  • [7] Productivity improvement of control cable manufacturing machine for the automotive industry
    Ramalho, P. M. S.
    Campilho, R. D. S. G.
    Silva, F. J. G.
    Pedroso, A. F. V.
    Sales-Contini, R. C. M.
    MECHANICS BASED DESIGN OF STRUCTURES AND MACHINES, 2024, 52 (12) : 9717 - 9740
  • [8] MANAGEMENT IN THE JAPANESE WIRE INDUSTRY.
    Brown, Raymond Lamont
    1600, (45):
  • [9] ULTRASONIC CLEANING IN THE WIRE INDUSTRY.
    Chamberlain, C.
    Wire Industry, 1981, 48 (565):
  • [10] HEAT TREATMENTS IN THE WIRE INDUSTRY.
    Nerurkar, H.M.
    Lakhani, I.
    TISCO (Tata Iron and Steel Co), 1977, 24 (04): : 133 - 141