SMALL CONTRACTOR CASHES IN ON ROAD REPAIR WORK.

被引:0
|
作者
Pawlett, Steve
机构
来源
Engineering and contract record | 1984年 / 97卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:10 / 11
相关论文
共 50 条
  • [1] Fibrous Mortar for Repair Work.
    Schroeder, Manfred
    Beton Dusseldorf, 1985, 35 (08): : 301 - 302
  • [2] EFFECTIVENESS OF REPAIR-ADJUSTMENT WORK.
    Malkin, A.I.
    Soviet Energy Technology (English translation of Energomashinostroenie), 1984, (08): : 78 - 79
  • [3] IMPROVING THE PLANNING AND ACCOUNTING OF REPAIR WORK.
    Kozlov, V.I.
    Erokhin, N.I.
    Shevchenko, G.N.
    Lemeshko, V.A.
    Soviet energy technology, 1987, (04): : 68 - 72
  • [4] MINI-BLASTING FOR REPAIR WORK.
    Lauritzen, Erik K.
    1600, (14):
  • [5] Automation of Freight Car Repair Work.
    Kaiser, Bonawentura
    Przeglad Mechaniczny, 1981, 40 (02): : 13 - 15
  • [6] Small, Winston, and Evans. Road Work. A new highway Pricing and Investment Policy
    Poole, Robert W. Jr.
    Transportation Research, Part A: General, 1990, 24A (03):
  • [7] Paris Ring Road. Acoustic Insulation Work.
    Ollivier, S.
    Leichtnam, M.
    Boulain, M.
    Scheffer, P.
    Travaux Paris, 1988, (628): : 46 - 50
  • [8] Community and contractor work together to repair sewer after earthquake
    Koberstein, David
    Public Works, 2003, 134 (07): : 36 - 38
  • [9] Vulnerabilities at work. Birth and news of the psychopathology of work.
    Cleach, Olivier
    NOUVELLE REVUE DU TRAVAIL, 2014, 4
  • [10] Aging and work.
    Duignan, K
    ERGONOMICS, 2005, 48 (06) : 739 - 741