共 50 条
- [1] CHARACTERISTICS OF LARGE HYDROELECTRIC GENERATORS FOR CHIRKEISKAYA HYDROELECTRIC POWER PLANT. Soviet electrical engineering, 1985, 56 (05): : 19 - 22
- [3] TURBINES FOR THE SHUL'BINSK HYDROELECTRIC POWER PLANT. Soviet energy technology, 1987, (01): : 51 - 54
- [4] 30-year experience of operating the Krasnoyarsk hydroelectric power plant. Hydroelectric generators Energetik, (12): : 4 - 5
- [5] Working Safety During the Construction of the Ziller Hydroelectric Power Plant. Oesterreichische Zeitschrift fuer Elektrizitaetswirtschaft, 1986, 39 (05): : 71 - 74
- [6] DEVELOPMENT OF AN INDEPENDENT-EXCITATION SYSTEM FOR HYDROELECTRIC GENERATORS AT THE KOLYMA HYDROELECTRIC POWER PLANT. Soviet electrical engineering, 1986, 57 (ll):
- [7] SEISMIC DESIGN CRITERIA FOR HYDROELECTRIC PLANT. American Society of Civil Engineers, Journal of the Power Division, 1973, 99 (PO2): : 305 - 315
- [9] Usual engineering features of the Conowingo dam and power plant. JOURNAL OF THE FRANKLIN INSTITUTE, 1927, 203 : 745 - 780
- [10] ENGINEERING ASSESSMENT OF AN ADVANCED PULVERIZED COAL POWER PLANT. Power Engineering (Barrington, Illinois), 1982, 86 (03): : 60 - 64