共 50 条
[31]
Status of Implementation of the Back End Fuel Cycle Concept in the Federal Republic of Germany.
[J].
Atw. Atomwirtschaft, Atomtechnik,
1981, 26 (07)
:421-424
[34]
Pricing of Gas as a Factor of International Market and the Supply and Demand of Gas in the Federal Republic of Germany.
[J].
Brennstoff-Waerme-Kraft,
1977, 29 (11)
:435-439
[36]
380 kV POWER LINES OF BAYERNWERK AG EXEMPLIFY THE DEVELOPMENT OF OVERHEAD LINE CONSTRUCTION IN GERMANY.
[J].
1978, 45 (10)
:443-448
[37]
290-MW-Air Storage Gas Turbine Power Plant in Huntorf, West Germany.
[J].
Erdoel und Kohle, Erdgas, Petrochemie vereinigt mit Brennstoff-Chemie,
1981, 34 (03)
:105-114
[38]
Application of the Process-computer System in the Combined Block at the Lausward Power Plant in West Germany.
[J].
1978, 77 (04)
:128-132
[39]
New Multiple-unit Trains - Series 270 for the Rapid Transit System in Berlin, Germany.
[J].
eb - Elektrische Bahnen,
1981, 79 (05)
:194-201
[40]
Cadia east open pit project mining study
[J].
Australasian Institute of Mining and Metallurgy Publication Series,
2007,
:37-44