Building CN's St. Clair River Tunnel

被引:0
|
作者
Kramer, Jerome
机构
来源
Railway Track and Structures | 1994年 / 90卷 / 03期
关键词
Construction - Earth boring machines - Linings;
D O I
暂无
中图分类号
学科分类号
摘要
Just over a century after the construction of what was then one of the world's most-impressive railway tunnels, a sequel is bing put together that matches the original for engineering spectacle. CN's new tunnel under the St. Clair River, between Sarnia. Ont., Port Huron. Mich., which will replace one that went into service more than a century ago, is being built by a massive tunnel-boring machine, named Excalibor, that is 31.2 feet tall, nearly 272 feel long, weighs 724 metric tons and cost $17 million (C).
引用
收藏
相关论文
共 50 条
  • [41] Parasites of the recently established round goby (Neogobius melanostomus) and tubenose goby (Proterorhinus marmoratus) (Cottidae) from the St. Clair River and Lake St. Clair, Michigan, USA
    Pronin, NM
    Fleischer, GW
    Baldanova, DR
    Pronina, SV
    FOLIA PARASITOLOGICA, 1997, 44 (01) : 1 - 6
  • [42] Rehabilitation of the St. John's tunnel
    Fischer, GR
    Levin, ME
    Garcia, DA
    H2GEO: GEOTECHNICAL ENGINEERING FOR WATER RESOURCES, 2005, (02): : 123 - 135
  • [43] Lake Huron's Phosphorus Contributions to the St. Clair-Detroit River Great Lakes Connecting Channel
    Scavia, Donald
    Anderson, Eric J.
    Dove, Alice
    Hill, Brad
    Long, Colleen M.
    Wang, Yu-Chen
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2020, 54 (09) : 5550 - 5559
  • [44] Nutrient concentrations and loadings in the St. Clair River-Detroit River Great Lakes Interconnecting Channel
    Burniston, Debbie
    Dove, Alice
    Backus, Sean
    Thompson, Aaron
    JOURNAL OF GREAT LAKES RESEARCH, 2018, 44 (03) : 398 - 411
  • [45] Northern Madtom Use of Artificial Reefs in the St. Clair-Detroit River System
    Johnson, Jennifer L.
    Chiotti, Justin A.
    Briggs, Andrew S.
    Boase, James C.
    Hessenauer, Jan-Michael
    Roseman, Edward F.
    NORTH AMERICAN JOURNAL OF FISHERIES MANAGEMENT, 2021, 41 : S42 - S53
  • [46] Socio-economics of remediating contaminated sediment for the St. Clair River Area of Concern
    Rivers, R
    WATER QUALITY RESEARCH JOURNAL OF CANADA, 2001, 36 (03): : 377 - 393
  • [47] Underthrust combustion of the type Jones in a power station for the electrical operation of the St. Clair tunnel.
    Gensch, M
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1910, 54 : 1913 - 1914
  • [48] BLACK CAMERA REMEMBERS ... St. Clair Bourne
    不详
    BLACK CAMERA, 2008, 22-23 (2-1) : 93 - 99
  • [49] GBI Cincinnati partners with St. Clair College
    不详
    MANUFACTURING ENGINEERING, 2004, 133 (06): : 93 - 93
  • [50] REMARKS FROM ST. CLAIR BOURNE MEMORIAL
    Cleaver, Kathleen
    BLACK CAMERA, 2008, 22-23 (2-1) : 103 - 104