Total flowtime in no-wait flowshops with separated setup times

被引:3
|
作者
Aldowaisan, Tariq [1 ]
Allahverdi, Ali [1 ]
机构
[1] Kuwait Univ, Safat, Kuwait
来源
Computers and Operations Research | 1998年 / 25卷 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:757 / 765
相关论文
共 50 条
  • [31] No-wait flowshop with separate setup times to minimize maximum lateness
    Rubén Ruiz
    Ali Allahverdi
    The International Journal of Advanced Manufacturing Technology, 2007, 35 : 551 - 565
  • [32] Minimizing makespan for no-wait flowshop scheduling problems with setup times
    Ying, Kuo-Ching
    Lin, Shih-Wei
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 121 : 73 - 81
  • [33] New heuristics for no-wait flowshops to minimize makespan
    Aldowaisan, T
    Allahverdi, A
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (08) : 1219 - 1231
  • [34] No-wait flowshop with separate setup times to minimize maximum lateness
    Ruiz, Ruben
    Allahverdi, Ali
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (5-6): : 551 - 565
  • [35] Hybrid evolutionary algorithm for no-wait flow shops to minimize makespan and total flowtime
    Liao, Xiaoping
    Liu, Yougen
    Li, Xiaoping
    Journal of Southeast University (English Edition), 2008, 24 (04) : 450 - 454
  • [36] Scheduling and Lot Streaming in Flowshops with No-Wait in Process
    Nicholas G. Hall
    Gilbert Laporte
    Esaignani Selvarajah
    Chelliah Sriskandarajah
    Journal of Scheduling, 2003, 6 : 339 - 354
  • [37] Scheduling and lot streaming in flowshops with no-wait in process
    Hall, NG
    Laporte, G
    Selvarajah, E
    Sriskandarajah, C
    JOURNAL OF SCHEDULING, 2003, 6 (04) : 339 - 354
  • [38] Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time
    Aldowaisan, T
    Allahverdi, A
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2004, 11 (02): : 113 - 123
  • [39] MINIMIZING TOTAL COMPLETION TIME IN A TWO-MACHINE NO-WAIT FLOWSHOP WITH UNCERTAIN AND BOUNDED SETUP TIMES
    Allahverdi, Muberra
    Allahverdi, Ali
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2020, 16 (05) : 2439 - 2457
  • [40] Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times
    Behjat, Saeed
    Salmasi, Nasser
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (01) : 22 - 48