Total flowtime in no-wait flowshops with separated setup times

被引:3
|
作者
Aldowaisan, Tariq [1 ]
Allahverdi, Ali [1 ]
机构
[1] Kuwait Univ, Safat, Kuwait
来源
Computers and Operations Research | 1998年 / 25卷 / 09期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:757 / 765
相关论文
共 50 条
  • [1] Total flowtime in no-wait flowshops with separated setup times
    Aldowaisan, T
    Allahverdi, A
    COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (09) : 757 - 765
  • [2] An efficient heuristic for total flowtime minimisation in no-wait flowshops
    Framinan, Jose Manuel
    Nagano, Marcelo Seido
    Moccellin, Joao Vitor
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (9-12): : 1049 - 1057
  • [3] An efficient heuristic for total flowtime minimisation in no-wait flowshops
    José Manuel Framinan
    Marcelo Seido Nagano
    João Vitor Moccellin
    The International Journal of Advanced Manufacturing Technology, 2010, 46 : 1049 - 1057
  • [4] Total completion time with makespan constraint in no-wait flowshops with setup times
    Allahverdi, Ali
    Aydilek, Harun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 238 (03) : 724 - 734
  • [5] Objective increment based metaheuristic for total flowtime minimization in no-wait flowshops
    School of Computer Science and Engineering, Southeast University, Nanjing 210096, China
    J. Southeast Univ. Engl. Ed., 2008, 2 (168-173): : 168 - 173
  • [6] Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
    Rubén Ruiz
    Ali Allahverdi
    Annals of Operations Research, 2007, 156 : 143 - 171
  • [7] Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
    Ruiz, Ruben
    Allahverdi, Ali
    ANNALS OF OPERATIONS RESEARCH, 2007, 156 (01) : 143 - 171
  • [8] A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times
    Nagano, Marcelo Seido
    Miyata, Hugo Hissashi
    Araujo, Daniella Castro
    JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 224 - 230
  • [9] Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
    Brown, SI
    McGarvey, R
    Ventura, JA
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (06) : 614 - 621
  • [10] Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times
    Cheng, Chen-Yang
    Ying, Kuo-Ching
    Li, Shu-Fen
    Hsieh, Ya-Chu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 130 : 338 - 347