AUTOMATIC CONTROL SYSTEM AND STAND-BY FACILITIES OF THE TDMA-40 EQUIPMENT.

被引:0
|
作者
Gudenko, D.V.
Pankov, G.Kh.
Pauk, A.G.
Tsirlin, V.M.
机构
关键词
MULTIPLEXING EQUIPMENT;
D O I
暂无
中图分类号
TN [电子技术、通信技术];
学科分类号
0809 ;
摘要
Satellite communication systems with time division multiple access (TDMA) are considered. The design principles and the basis solutions to the problems involved in developing the equipment for monitoring and controlling systems based on multistation access using time division multiplexing are described. Algorithms are presented for the operation of the synchronizing processor and the control processor of this equipment in the mode of operation of controlling and controlled stations.
引用
收藏
页码:50 / 54
相关论文
共 50 条
  • [41] AUTOMATIC WIDTH CONTROL IN ROUGHING TRAIN OF HOT STRIP MILL .1. FACILITIES AND SYSTEM
    SAITOH, S
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1143 - 1143
  • [42] AUTOMATIC WIDTH CONTROL IN ROUGHING TRAIN OF HOT STRIP MILL .1. FACILITIES AND SYSTEM
    SAITOH, S
    IBATA, H
    NAKATA, T
    KISHIMOTO, Y
    AKAMATSU, H
    NAKAI, Y
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 26 (01) : B20 - B20
  • [43] Development of semi-automatic control system for new shootings cuttage propagation facilities of blueberry
    Zhang, Daohui
    Wang, Jiawei
    Zong, Xiaojuan
    Wei, Hairong
    Xu, Li
    Liu, Qingzhong
    Nongye Gongcheng Xuebao/Transactions of the Chinese Society of Agricultural Engineering, 2012, 28 (18): : 8 - 15
  • [44] Developing New Power System Supervision and Control Equipment (PS-SVC) for Power Receiving Facilities
    Murakami, Toshiaki
    Naitou, Hiroshi
    Tawara, Takeru
    INTELEC 09 - 31ST INTERNATIONAL TELECOMMUNICATIONS ENERGY CONFERENCE, 2009, : 889 - 895
  • [45] Study on the Control System of an Automatic Testing Equipment for Diffusion Vacuum Pumps by Fault Tree Analysis
    Zhang, Shiwei
    Liang, Wensheng
    Zhang, Zhijun
    MATERIALS AND PRODUCT TECHNOLOGIES, 2010, 118-120 : 556 - 560
  • [46] An M[X]/G(a,b)/1 Queueing System with Breakdown and Repair, Stand-By Server, Multiple Vacation and Control Policy on Request for Re-Service
    Ayyappan, G.
    Karpagam, S.
    MATHEMATICS, 2018, 6 (06)
  • [47] Electrical equipment, control and measuring instruments, and automatic control system of blast furnace no. 3 at the VSZh Koshitse combine
    Chutora, Sh.
    Shkripko, Sh.
    Oleyar, M.
    Chaika, J.
    METALLURGIST, 2006, 50 (7-8) : 393 - 397
  • [48] Electrical equipment, control and measuring instruments, and automatic control system of blast furnace no. 3 at the VSZh Koshitse combine
    Sh. Chutora
    Sh. Shkripko
    M. Oleyar
    J. Chaika
    Metallurgist, 2006, 50 : 393 - 397
  • [49] Design and Implement of Automatic Plastic Gasoline Tank Water-Cooling Equipment and Its Control System
    Li, G. Q.
    Wang, T. Y.
    Sun, S.
    Chen, L. H.
    Yang, H.
    Guo, P. P.
    Zhang, Y.
    MANUFACTURING AUTOMATION TECHNOLOGY, 2009, 392-394 : 35 - +
  • [50] Development of Automatic Digital Control Interface for Addressing a Lighting Equipment System Using High Power Load
    Pu, Wen Cheng
    Tsai, Cheng Yu
    SENSORS AND MATERIALS, 2021, 33 (06) : 1829 - 1848