Papua New Guinea has abundant small-scale hydropower resources. The government is replacing diesel generating units with mini and micro hydropower plants to serve remote centers. This is the exception, since no other clear rural electrification policy operates, and most of the existing micro hydro schemes have been developed outside the public sector. In this article, two case studies are presented, and an attempt has been made to identify the key factors that led to the relative difference to costs.