This article describes the new pipeline called Main Line 80. The new pipeline connects Questar Pipeline's northern and southern transmission systems. The northern system runs from near Craig, Colo., past Rock Springs, Wyo., to the Wasatch Front. The southern system begins near Rifle, Colo., and runs south of Vernal, through Price to Payson.