共 50 条
- [21] Japan enters new gas pipeline construction phase to prepare for long-term gas-supply growth Global Pipeline Mon., 2
- [22] WATER-SUPPLY PROBLEMS IN THE CONSTRUCTION AND OPERATION OF AN OIL PIPELINE - A CASE-STUDY OF THE SAINT-LAWRENCE LOWLANDS WATER SUPPLY & MANAGEMENT, 1980, 4 (5-6): : 397 - 407
- [27] A model based framework for specifying and executing fault injection experiments Proc. Int. Conf. Dependability Comput. Syst., DepCos-RELCOMEX, (107-114):
- [28] SPECIFYING COATING SYSTEMS FOR METAL WALL AND ROOF PANELS. Plant Engineering (Barrington, Illinois), 1981, 35 (08): : 157 - 159
- [29] SPECIFYING COATING SYSTEMS USING ZINC RICH PRIMERS. Construction Specifier, 1974, 27 (09): : 42 - 45
- [30] GET YOUR PLASTICS RIGHT BY SPECIFYING THE RIGHT FILLERS. Industrial research/development, 1981, 23 (03): : 142 - 146