共 50 条
- [41] Designing Electric Power Supply System for Auxiliary Services of Steam Power Plants. Energia Elettrica, 1984, 61 (02): : 77 - 84
- [42] GUIDE FOR THE ASSESSMENT OF THE RELIABILAITY OF GASIFICATION-COMBINED-CYCLE POWER PLANTS. Electric Power Research Institute, Advanced Power Systems Division, (Report) EPRI AP, 1980, (1610):
- [43] GUIDE FOR THE ASSESSMENT OF THE AVAILABILITY OF GASIFICATION-COMBINED-CYCLE POWER PLANTS. Electric Power Research Institute, Advanced Power Systems Division, (Report) EPRI AP, 1982,
- [44] CONCEPTUAL DESIGN OF AN MHD/STEAM POWER PLANT OF PILOT SCALE (ETF) AND PRELIMINARY ANALYSES OF EARLY COMMERCIAL MHD POWER PLANTS. Symposium - Engineering Aspects of Magnetohydrodynamics, 1979,
- [46] EXPERIENCE IN OPERATION OF SMOKE STACKS AT MOSENERGO THERMAL POWER PLANTS. Soviet power engineering, 1981, 10 (09): : 1204 - 1209
- [48] Ecological Requirements and Efficacy of Ash Collection at Thermal Power Plants. Teploenergetika, 1983, (09): : 19 - 22
- [49] MODERN MAN-MACHINE SYSTEMS FOR THERMAL POWER PLANTS. Hitachi Review, 1986, 35 (05): : 275 - 278
- [50] Utilization of Exergy Function in Mathematical Modeling of Thermal Power Plants. Izvestiya Vysshikh Uchebnykh Zavedenij i Energeticheskikh Ob''edinenij Sng. Energetika, 1976, (10): : 139 - 143