共 50 条
- [31] A flowshop scheduling problem with machine deterioration and maintenance activities 2012 17TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2012, : 40 - 45
- [32] Bottleneck focused heuristic algorithm for flow shop scheduling problem Jisuanji Jicheng Zhizao Xitong, 1600, 2 (356-363):
- [35] A GRASP heuristic for the multi-objective permutation flowshop scheduling problem The International Journal of Advanced Manufacturing Technology, 2011, 55 : 741 - 753
- [39] Heuristic algorithms for two-machine re-entrant flowshop scheduling problem with jobs of two classes JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2017, 11 (05):