Productivity of inside casing gravel- pack completions

被引:0
作者
WILLIAMS BB
ELLIOTT LS
WEAVER RH
机构
来源
JPT, Journal of Petroleum Technology | 1972年 / 24卷
关键词
Oil well completion;
D O I
10.2118/3590-pa
中图分类号
学科分类号
摘要
Field results from gravel- pack treatments show that wells completed with an open- hole gravel pack have from two to ten times the productivity of cased wells completed with an inside gravel pack and a high- pressure squeeze, or with an inside gravel pack alone. A study of flow resistances imposed by gravel packing a cased well shows that the greatest resistance is often through the sand- filled perforations. Field test data verify that increasing perforation area can increase productivity.
引用
收藏
页码:419 / 425
相关论文
empty
未找到相关数据