ALLOCATING RISK AND INCENTIVE IN CONSTRUCTION

被引:0
|
作者
Levitt, Raymond E.
Ashley, David B.
Logcher, Robert D.
机构
来源
Journal of the Construction Division | 1980年 / 106卷 / 03期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
CONSTRUCTION INDUSTRY
引用
收藏
页码:297 / 305
相关论文
共 50 条
  • [1] COST PLUS INCENTIVE FEE FOR CONSTRUCTION CONTRACTS.
    O'Connor, M.J.
    Colwell, G.E.
    Technical Report - United States Army Corps of Engineers, Construction Engineering Research Laboratory, 1980, (P-118):
  • [2] Risk Management in Construction Industry
    Divya Sankar, Surisetti
    Shashikanth, Kulkarni
    Mahender, Sangamalla
    Lecture Notes in Civil Engineering, 2022, 183 : 45 - 55
  • [3] Risk Field Model Construction and Risk Classification of Hazardous Chemical Transportation
    Chang, Lv
    Liu, Qiongqiong
    Yan, Jin
    Liu, Peng
    Zhu, Sida
    Hu, Xiaoming
    Ni, Jun
    Zhang, Tong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [4] The method of identification and quantification of construction projects risk
    Department of Construction Engineering, Civil Engineering Faculty, Land Forces Military Academy, Wroclaw, Poland
    1600, 647-662 (2005):
  • [5] Allocating resources for epidemic spreading on metapopulation networks
    Zhu, Xuzhen
    Liu, Yuxin
    Wang, Shengfeng
    Wang, Ruijie
    Chen, Xiaolong
    Wang, Wei
    Applied Mathematics and Computation, 2021, 411
  • [6] ALLOCATING BUILDING INSPECTION MANPOWER FOR FIRE-PREVENTION
    MILLER, DM
    FYFFE, DE
    MANAGEMENT SCIENCE, 1976, 22 (12) : 1310 - 1319
  • [7] Joint Ventures in Construction 2: Contract, Governance, Performance and Risk
    Joint Ventures in Construction 2: Contract, Governance, Performance and Risk, 2012,
  • [8] Risk analysis of tunnel construction based on DEMATEL-ISM
    Lin, Deng
    Yuanqi, Zhou
    Chongsen, Ma
    World of Mining - Surface and Underground, 2022, 74 (04): : 212 - 217
  • [9] Risk Management of Prefabricated Building Construction Based on Fuzzy Neural Network
    Yang, Maohua
    SCIENTIFIC PROGRAMMING, 2022, 2022
  • [10] Study on Construction Schedule Risk Factors for Bridge Renovation Based on DBN
    Dong, Kai
    Wu, Hao
    Chen, Jian
    You, Yang
    12th International Symposium on Project Management, ISPM 2024, 2024, 2 : 1302 - 1310