ECONOMIC PRODUCTION CYCLES WITH IMPERFECT PRODUCTION PROCESSES.

被引:0
作者
Rosenblatt, Meir J. [1 ]
Lee, Hau L. [1 ]
机构
[1] Technion-Israel Inst of Technology, Haifa, Isr, Technion-Israel Inst of Technology, Haifa, Isr
来源
IIE Transactions (Institute of Industrial Engineers) | 1986年 / 18卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
19
引用
收藏
页码:48 / 55
相关论文
共 50 条
[31]   An optimal common production cycle time for imperfect production processes with scrap [J].
Ma, Wen-Na ;
Gong, Dah-Chuan ;
Lin, Gary C. .
MATHEMATICAL AND COMPUTER MODELLING, 2010, 52 (5-6) :724-737
[32]   Optimal number of production corrections before maintenance of imperfect production processes [J].
Sheu, Shey-Huei ;
Lin, Yuh-Bin ;
Liao, Gwo-Liang .
International Journal of Advanced Manufacturing Technology, 2006, 30 (3-4) :319-327
[33]   A New Sustainable Economic Production Quantity Model with Imperfect Production and Shortage [J].
Ceylan, Mustafa ;
Aydemir, Erdal .
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2025,
[34]   The impact of imperfect processes on production run times [J].
Boone, T ;
Ganeshan, R ;
Guo, YM ;
Ord, JK .
DECISION SCIENCES, 2000, 31 (04) :773-787
[35]   COMPUTER-AIDED DESIGN OF FOUNDRY PRODUCTION PROCESSES. [J].
Anon .
Soviet energy technology, 1987, (05)
[36]   Some Problems of Optimization of Oil and Gas Production Processes. [J].
Bitsuta, V.K. ;
Smotritskii, Sh.M. .
Izvestia vyssih ucebnyh zavedenij. Neft i gaz, 1979, (09) :71-74
[37]   Necessities and Possibilities of Material and Energy Savings in Production Processes. [J].
Scharmer, K. .
Brennstoff-Waerme-Kraft, 1987, 39 (12) :535-538
[38]   APPLICATION OF GATE ARRAYS IN INDUSTRIAL DEVELOPMENT AND PRODUCTION PROCESSES. [J].
Hoehne, Juergen W. .
IEEE transactions on industrial electronics and control instrumentation, 1984, IE-33 (04) :353-354
[39]   ROBUSTNESS OF CONTINUOUS SAMPLING PLANS FOR MARKOVIAN PRODUCTION PROCESSES. [J].
Sampath Kumar, V.S. .
QR journal, 1986, 13 (01) :13-16
[40]   The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions [J].
Hariga, M ;
Ben-Daya, M .
NAVAL RESEARCH LOGISTICS, 1998, 45 (04) :423-433