Heuristic algorithm for project scheduling with splitting allowed

被引:0
|
作者
Valls, Vicente [1 ]
Marti, Rafael [1 ]
Lino, Pilar [1 ]
机构
[1] Universidad de Valencia, Burjassot, Spain
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:87 / 104
相关论文
共 50 条
  • [1] A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters
    Khalilzadeh, Mohammad
    Shakeni, Hedieh
    Gholami, Hadis
    Amini, Leila
    CENTERIS 2017 - INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / PROJMAN 2017 - INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / HCIST 2017 - INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERI, 2017, 121 : 63 - 71
  • [2] HEURISTIC ALGORITHM FOR PROJECT SCHEDULING WITH LIMITED RESOURCES.
    Jain, T.C.
    Hardas, A.M.
    Journal of the Institution of Engineers (India): Mechanical Engineering Division, 1984, 65 : 6 - 9
  • [3] The application of an admissible heuristic algorithm to project scheduling problem
    Zamani, R
    Shue, LY
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 1997, 10 (5-6) : 308 - 315
  • [4] Solving project scheduling problems with a heuristic learning algorithm
    Zamani, R
    Shue, LY
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (07) : 709 - 716
  • [5] Multi-project scheduling using an heuristic and a genetic algorithm
    Kumanan, S.
    Jegan Jose, G.
    Raja, K.
    International Journal of Advanced Manufacturing Technology, 2006, 31 (3-4): : 360 - 366
  • [6] A Heuristic Algorithm for Solving Resource Constrained Project Scheduling Problems
    Chand, Shelvin
    Singh, Hemant Kumar
    Ray, Tapabrata
    2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 225 - 232
  • [7] Multi-Project Scheduling Using a Heuristic and Memetic Algorithm
    Kumanan, S.
    Raja, K.
    JOURNAL FOR MANUFACTURING SCIENCE AND PRODUCTION, 2009, 10 (3-4) : 249 - 256
  • [8] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
    Seda, Milos
    Matousek, Radomil
    Osmera, Pavel
    Pivonka, Petr
    Sandera, Cenek
    WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
  • [9] Multi-project scheduling using an heuristic and a genetic algorithm
    Kumanan, S.
    Jose, G. Jegan
    Raja, K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4): : 360 - 366
  • [10] Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems
    Mahmud, Firoz
    Zaman, Forhad
    Sarker, Ruhul
    Essam, Daryl
    2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,