共 50 条
[41]
Prediction and Optimization of Blasting-Induced Ground Vibration in Open-Pit Mines Using Intelligent Algorithms
[J].
APPLIED SCIENCES-BASEL,
2023, 13 (12)
[43]
Damage to underground excavations from open-pit blasting
[J].
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY,
1997, 106
:A19-A24
[45]
CURRENT DRILLING AND BLASTING PRACTICES IN OPEN PIT MINES
[J].
MINING CONGRESS JOURNAL,
1972, 58 (03)
:20-&
[46]
IN-PIT CRUSHING - STILL GAINING GROUND IN OPEN-PIT MINES
[J].
E&MJ-ENGINEERING AND MINING JOURNAL,
1987, 188 (06)
:76-80
[47]
Tracking Production Volumes of Open-Pit Mines with Photogrammetry
[J].
UKSIM-AMSS 11TH EUROPEAN MODELLING SYMPOSIUM ON COMPUTER MODELLING AND SIMULATION (EMS 2017),
2017,
:100-106
[48]
ON IMPROVING TRUCK SHOVEL PRODUCTIVITY IN OPEN-PIT MINES
[J].
CIM BULLETIN,
1993, 86 (973)
:43-49
[50]
Cut slope reinforcement technique in open-pit mines
[J].
JOURNAL OF UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING,
2004, 11 (04)
:289-292