共 50 条
- [31] ENERGY - EXERGY ANALYSIS OF COMBINED POWER PLANT. Energy Management New Delhi, 1987, 11 (02): : 103 - 109
- [32] Design and Construction of the Brunsbuettel Nuclear Power Plant. VGB Kraftwerkstechnik, 1977, 57 (11): : 729 - 735
- [35] IMPROVING PLANT MAINTENANCE, SCHEDULING AND PRODUCTIVITY AT A NUCLEAR POWER PLANT. Practical lubrication & maintenance, 1986, 9 (03):
- [36] Some Limiting Characteristics of the Turbine Reactor of the Uranium Hexafluoride Gas Turbine Plant. Izvestiya Vysshikh Uchebnykh Zavedenij i Energeticheskikh Ob''edinenij Sng. Energetika, 1975, (12): : 77 - 80
- [37] Effect of Radial Gap on Reduced Parameters of Gas Turbine Plant. Energomashinostroenie, 1983, (02): : 9 - 10
- [38] Experience Gained in the Design, Construction and Startup of a Gas Turbine Plant. Gaswaerme International, 1985, 34 (11): : 450 - 454