Ten-year Operation of the River Power Plant of the Danube Hydroelectric Power Plant Co. in West Germany.

被引:0
作者
Ertl, Walter
von Tubeuf, Manfred
机构
来源
eb - Elektrische Bahnen | 1981年 / 79卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Four hydroelectric power stations of the Donau-Wasserkraft AG erected between 1965 and 1971 have proved successfully during ten years of operation the expectations set on them. Emphasis was put on satisfactory blending with the environment. The energy production is adapted to the demands of the West German Railroad System by a suitable mode of operation.
引用
收藏
页码:263 / 266
相关论文
共 50 条
[21]   Heinzel Energy New Danzermuehl Hydroelectric Power Plant starts Operation [J].
不详 .
WOCHENBLATT FUR PAPIERFABRIKATION, 2019, 147 (11) :704-707
[22]   Analysis of the coordinated operation of a hydroelectric power plant and a wind farm in Patagonia [J].
Ignacio Levieux, Luis ;
Inthamoussou, Fernando A. ;
De Battista, Hernan .
2017 XVII WORKSHOP ON INFORMATION PROCESSING AND CONTROL (RPIC), 2017,
[23]   Ten years of solar power plant operation in the Mojave desert [J].
Cohen, GE ;
Frier, SD .
PROCEEDINGS OF THE 1997 AMERICAN SOLAR ENERGY SOCIETY ANNUAL CONFERENCE, 1997, :77-81
[24]   Performance Evaluation of Hydropower Operation for Nickel Smelter: A Case Study of Larona River Cascade Hydroelectric Power Plant [J].
Kasman, Wafir ;
Arifin, Ir Syamsul .
ADVANCED INDUSTRIAL TECHNOLOGY IN ENGINEERING PHYSICS, 2019, 2088
[26]   Structure dynamics of a fish community over ten years of formation in the reservoir of the hydroelectric power plant in upper Uruguay River [J].
Schork, G. ;
Zaniboni-Filho, E. .
BRAZILIAN JOURNAL OF BIOLOGY, 2017, 77 (04) :710-723
[27]   30-year experience of operating the Krasnoyarsk hydroelectric power plant. Hydroelectric generators [J].
Latyshev, V.I. ;
Khikhol, A.M. ;
Sokolov, A.E. .
Energetik, (12) :4-5
[28]   Experience Gained from Operation of the Hydraulic Structures of the Votkinsk Hydroelectric Power Plant [J].
Lenkov A.Y. ;
Fisenko V.F. .
Power Technology and Engineering, 2017, 51 (1) :33-39
[29]   LIFETIME EVALUATION OF THE MECHANICAL ELEMENTS FOR A RUN-OF-RIVER HYDROELECTRIC POWER PLANT [J].
Piraianu, Vlad Florin ;
Dragoi, Constantin ;
Vasilescu, Anca ;
Vuta, Liana Ioana ;
Dumitran, Gabriela Elena .
ENERGY AND CLEAN TECHNOLOGIES CONFERENCE PROCEEDINGS, SGEM 2016, VOL I, 2016, :473-480
[30]   Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study [J].
M. Cihat Tuna .
Arabian Journal for Science and Engineering, 2013, 38 :1359-1367