Based on the basic principle of large deformation body put forward by Chen Zhida, it is unreasonable to study large deformation tunnel with small deformation theory. The non-linear numerical simulation method of large deformation is applied to analyze Erlanshan highway tunnel with large deformation occurrence. Furthermore, the essence of the large deformation occurrence about weak rockmass tunnel under high initial in-situ stresses is discussed.