GROUND FREEZING AIDS SWISS TUNNEL CONSTRUCTION.

被引:0
|
作者
Aerni, K.
Mettier, K.
机构
来源
Tunnels and Tunnelling International | 1981年 / 13卷 / 03期
关键词
GEOLOGY - Engineering - HIGHWAY SYSTEMS - SOILS - Frozen;
D O I
暂无
中图分类号
学科分类号
摘要
Ground freezing, currently gaining in popularity, was selected as the most suitable method of providing ground stability in the moraine section of an urban motorway tunnel under Zurich where clearance under some of the buildings was as little as 6 m. The ground consists of interbedded marl and sandstone (freshwater molasse), and an area of well compacted moraine with inclusions of noncohesive silty sand material and the presence of some water under an artesian pressure of up to 3 bar.
引用
收藏
页码:52 / 53
相关论文
共 50 条
  • [1] MEASURING UP FOR TUNNEL CONSTRUCTION.
    Dutro, Howard B.
    Perry, D.J.
    Tunnels and Tunnelling International, 1987, 19 (06): : 47 - 49
  • [2] Ground freezing application of intake installing construction of an underwater tunnel
    Hu, Xiangdong
    Deng, Shengjun
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 633 - 640
  • [3] The Elbe tunnel in Hamburg and its construction.
    Stockhausen, O
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 : 1301 - 1311
  • [4] DESIGNING ACCESS SHAFTS FOR TUNNEL CONSTRUCTION.
    Wilson, Nyal E.
    Engineering journal Toronto, 1980, 63 (05): : 12 - 15
  • [5] Internal Shells for Rock Tunnel Construction.
    Maak, Helmut
    Maidl, Bernhard
    Springenschmid, Rupert
    Beton- und Stahlbetonbau, 1987, 82 (11) : 285 - 290
  • [6] The Elbe Tunnel in Hamburg and its construction.
    Stockhausen, O
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 : 1448 - 1452
  • [7] FE-analysis of ground freezing for the construction of a tunnel cross connection
    Cudmani, Roberto
    Nagelsdiek, Siegfried
    NUMERICAL MODELLING OF CONSTRUCTION PROCESSES IN GEOTECHNICAL ENGINEERING FOR URBAN ENVIRONMENT, 2006, : 201 - +
  • [8] The Elbe tunnel in Hamburg and its construction.
    Stockhausen, O
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 : 1389 - 1395
  • [9] GROUND FREEZING FOR CONSTRUCTION
    BRAUN, B
    NASH, WR
    CIVIL ENGINEERING, 1985, 55 (01): : 54 - 56
  • [10] Rail-Guided Haulage in Tunnel Construction.
    Schlick, Heinrich
    BMT. Baumaschine + Bautechnik, 1986, 33 (10): : 447 - 452