共 50 条
- [1] Operation experience of concrete transportation system for Jiangya dam Ren Min Chang Jiang, 6 (38-39):
- [2] Temperature Stress Analysis for Concrete Dam of Jiangya Hydropower Station MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY, 2014, 556-562 : 683 - 686
- [3] Environmental management and monitoring of Jiangya project Renmin Changjiang/Yangtze River, 2000, 31 (02): : 26 - 27
- [4] On construction archives management of Jiangya project 2000, Renmin Changjiang, Wuhan, China (31):
- [5] International and internal bidding management for Jiangya project Renmin Changjiang/Yangtze River, 2000, 31 (02): : 2 - 4
- [6] Management for the procurement of mechanic and electric equipments for Jiangya project Renmin Changjiang/Yangtze River, 2000, 31 (02):
- [7] Formation mechanism and trend analysis of lifting of valley and dam in Jiangya hydraulic project Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2007, 26 (06): : 1107 - 1115
- [8] On manufacture and installation of metal structures and their contract management for Jiangya project Renmin Changjiang/Yangtze River, 2000, 31 (02):
- [9] Quality control and management for mechanic and electric installation of Jiangya Project Renmin Changjiang/Yangtze River, 2000, 31 (04):