共 50 条
- [43] ASPECTS OF MEASUREMENT AND OPERATION. IBA Technical Review (Independent Broadcasting Authority), 1981, (14): : 14 - 22
- [46] TESTING STEAM TRAP OPERATION. Plant Engineering (Barrington, Illinois), 1977, 31 (06): : 147 - 150
- [47] Paranal: the VLT and VLTI in operation. GROUND-BASED TELESCOPES, PTS 1 AND 2, 2004, 5489 : 267 - 277
- [48] Construction work on the Schlussee operation. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1931, 75 : 1441 - 1442
- [50] QUICK TAPPING BOF OPERATION. Tetsu-To-Hagane/Journal of the Iron and Steel Institute of Japan, 1976, 62 (02): : 247 - 253