Different factors considered in project selection at public and private R&D institutes

被引:0
|
作者
Korea Advanced Inst of Science and, Technology, Taejon, Korea, Republic of [1 ]
机构
来源
Technovation | / 6卷 / 271-275期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Different factors considered in project selection at public and private R&D institutes
    Lee, MS
    Om, KY
    TECHNOVATION, 1996, 16 (06) : 271 - 275
  • [2] R&D project prioritisation model for public research institutes
    Mohan, SR
    Rao, AR
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2002, 61 (12): : 1033 - 1038
  • [3] R&D project selection versus R&D project generation
    Bordley, RF
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1998, 45 (04) : 407 - 413
  • [4] Public R&D project portfolio selection problem with cancellations
    Musa Çağlar
    Sinan Gürel
    OR Spectrum, 2017, 39 : 659 - 687
  • [5] Public R&D project portfolio selection problem with cancellations
    Caglar, Musa
    Gurel, Sinan
    OR SPECTRUM, 2017, 39 (03) : 659 - 687
  • [6] Static R&D project portfolio selection in public organizations
    Arratia M, N. M.
    Lopez, F., I
    Schaeffer, S. E.
    Cruz-Reyes, L.
    DECISION SUPPORT SYSTEMS, 2016, 84 : 53 - 63
  • [7] Design Thinking for Public R&D: Focus on R&D Performance at Public Research Institutes
    Lim, Seonyeong
    Kim, Minseo
    Sawng, Yeong-wha
    SUSTAINABILITY, 2022, 14 (13)
  • [8] Public R&D expenditure and private R&D expenditure: a causality analysis
    Yoo, SH
    APPLIED ECONOMICS LETTERS, 2004, 11 (11) : 711 - 714
  • [9] Classification of R&D projects and selection of R&D project management concept
    Kuchta, Dorota
    Skowron, Dorota
    R & D MANAGEMENT, 2016, 46 (05) : 831 - 841
  • [10] Uncertain Public R&D Project Portfolio Selection Considering Sectoral Balancing and Project Failure
    Li, Hongbo
    Chen, Rui
    Zhang, Xianchao
    SUSTAINABILITY, 2022, 14 (23)