Installation of the world's first 500-kV XLPE cable with intermediate joints

被引:0
作者
Suzuki, Akira [1 ]
Nakamura, Shin'ji [1 ]
Matsuda, Moriaki [1 ]
Tanaka, Hiroshi [1 ]
Shiomitsu, Masaaki [1 ]
Hiraga, Kiyoaki [1 ]
Adachi, Kiyomi [1 ]
Hiratsuka, Katsuyoshi [1 ]
Matsuda, Kazuhiko [1 ]
Yagi, Masashi [1 ]
Sudo, Akihisa [1 ]
Sugawara, Kimiji [1 ]
机构
[1] Tokyo Electric Power Co, Inc, Tokyo, Japan
来源
| 2000年 / Furukawa Electr Co Ltd, Japan卷
关键词
Cable jointing - Electric power distribution - Extrusion molding;
D O I
暂无
中图分类号
学科分类号
摘要
Tokyo Electric Power's Kazunogawa Power Station will, when completed, be Japan's largest pumped-storage hydroelectric power station, with an output of 1.6 GW. The first phase is currently under construction, with two 400-MW machines and one cable circuit. Using leading-edge technology Furukawa Electric has provided 500-kV XLPE cable and associated extrusion-molded joints (EMJs) and horizontal gas-immersed sealing ends (EBGs) for the No. 1 and No. 2 machines. Construction was completed in November 1998 and voltage withstand tests have also been performed. The cable for this line is 2300 m in length, longer than has ever been used in a power station interconnect. Because of transportation constraints, insulation-type EMJs are installed at intermediate points. The line is being built under the same basic design concept and installation conditions as the Shin-Keiyo-Toyosu Line now under construction, and reflects the expertise and knowhow acquired there. The equipment covered here is scheduled to go into service in December, 1999.