共 50 条
- [21] Implications of environmental constraints in hydropower scheduling for a power system with limited grid and reserve capacity ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2023,
- [22] Stochastic Models in Risk-based Assessment of Reserve Requirements for a Power System with High Wind Power Generation 2016 SECOND INTERNATIONAL SYMPOSIUM ON STOCHASTIC MODELS IN RELIABILITY ENGINEERING, LIFE SCIENCE AND OPERATIONS MANAGEMENT (SMRLO), 2016, : 136 - 143
- [23] Impact of Large-Scale Wind and Solar Power Integration on Operating Reserve Requirements of an Islanded Power System 2018 MORATUWA ENGINEERING RESEARCH CONFERENCE (MERCON) 4TH INTERNATIONAL MULTIDISCIPLINARY ENGINEERING RESEARCH CONFERENCE, 2018, : 589 - 594
- [24] Reserve Requirements in AC Power Systems With Uncertain Generation 2013 4TH IEEE/PES INNOVATIVE SMART GRID TECHNOLOGIES EUROPE (ISGT EUROPE), 2013,
- [28] Fuzzy scheduling control of a power plant 2000 IEEE POWER ENGINEERING SOCIETY WINTER MEETING - VOLS 1-4, CONFERENCE PROCEEDINGS, 2000, : 441 - 445
- [29] Calculating reserve power requirements from wind-power forecasts JOURNAL OF ENGINEERING-JOE, 2019, 2019 (09): : 5427 - 5431