Power system scheduling with fuzzy reserve requirements

被引:0
|
作者
Xian Jiaotong Univ, Shaanxi, China [1 ]
机构
来源
IEEE Trans Power Syst | / 2卷 / 864-869期
关键词
All Open Access; Green;
D O I
暂无
中图分类号
学科分类号
摘要
Electric power systems
引用
收藏
相关论文
共 50 条
  • [1] Power system scheduling with fuzzy reserve requirements
    Guan, XH
    Luh, PB
    Prasannan, B
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) : 864 - 869
  • [2] Price-based adaptive spinning reserve requirements in power system scheduling
    Tseng, CL
    Oren, SS
    Svoboda, AJ
    Johnson, RB
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1999, 21 (02) : 137 - 145
  • [3] Adaptive regulating reserve scheduling for the isolated power system
    Chang-Chien, Le-Ren
    Chien, Chung-Wei
    Hu, Tsung-Hao
    EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2012, 22 (08): : 1065 - 1077
  • [4] Optimization based accurate scheduling for generation and reserve of power system
    GAO YunLong1
    2 SKLMS Laboratory
    3 College of Information Engineering
    4 School of Information Technology
    Science China(Technological Sciences), 2012, (01) : 223 - 232
  • [5] Optimization based accurate scheduling for generation and reserve of power system
    YunLong Gao
    JinYan Pan
    ZiJiang Yang
    Feng Gao
    GuoLi Ji
    Science China Technological Sciences, 2012, 55 : 223 - 232
  • [6] Optimization based accurate scheduling for generation and reserve of power system
    GAO YunLongPAN JinYanYANG ZiJiangGAO Feng JI GuoLi Department of AutomationXiamen UniversityXiamen China SKLMS LaboratoryXian Jiaotong UniversityXian China College of Information EngineeringJimei UniversityXiamen China School of Information TechnologyYork UniversityTorontoCanada MJ PCanada
    Science China(Technological Sciences), 2012, 55 (01) : 223 - 232
  • [7] Optimization based accurate scheduling for generation and reserve of power system
    Gao YunLong
    Pan JinYan
    Yang ZiJiang
    Gao Feng
    Ji GuoLi
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2012, 55 (01) : 223 - 232
  • [8] Maximum wind power generation in a power system imposed by system inertia and primary reserve requirements
    Fernandez-Bernal, F.
    Egido, I.
    Lobato, E.
    WIND ENERGY, 2015, 18 (08) : 1501 - 1514
  • [9] Power system reliability impacts of wind generation and operational reserve requirements
    Gil, E.
    INGENIERIA E INVESTIGACION, 2015, 35 : 82 - 88
  • [10] A real-time contingency reserve scheduling for an isolated power system
    Chang-Chien, Le-Ren
    Lin, Yin-Juin
    Wu, Chin-Chung
    IEEE TRANSACTIONS ON RELIABILITY, 2007, 56 (01) : 139 - 147