NEW STEELS CUT TOOL AND MATERIAL COSTS.

被引:0
|
作者
Anon
机构
来源
Machinery and Production Engineering | 1986年 / 144卷 / 3702期
关键词
CUTTING TOOLS - Wear - METAL CUTTING - Efficiency;
D O I
暂无
中图分类号
学科分类号
摘要
Dean, Smith & Grace, a machine tool builder in Keighley, Yorkshire, has switched from a proprietary make of free-cutting alloy steel to a new 817M40T (heat-treated) steel known as IQ (improved quality) for manufacturing various machine transmission components. Initial tests carried out by DS&G on IQ steel were performed on 75 and 160 mm diameter bar. Cutting speeds for turning were raised from the 350 ft/min maximum found practical with standard (untreated) 817M40T to the 550 ft/min consistently used for the original proprietary steel. The original feed rates and depths of cut were restored; and the results were, says DS&G, satisfactory. Tool life was increased by as much as 300 percent, compared with that obtained when cutting standard 817M40T, and tolerances for size, geometry and surface finish could be held.
引用
收藏
页码:34 / 35
相关论文
共 50 条
  • [31] FLOPPY DISK PRESCANNERS CUT CERTIFICATION COSTS.
    Bangerter, Don
    Williamson, Bill
    Computer Technology Review, 1986, 6 (04): : 88 - 89
  • [32] CUTTING CUTTING TOOL INVENTORY COSTS.
    Hutton, Ronald C.
    Manufacturing Systems, 1986, 4 (09): : 28 - 30
  • [33] DECENTRALIZED ENERGY PLAN HELPS CUT ESCALATING COSTS.
    Anon
    Plant energy management, 1981, 5 (06):
  • [34] ADHESIVES HIKE PRODUCTIVITY, CUT PRODUCT ASSEMBLY COSTS.
    Cassidy, Victor M.
    Modern Metals, 1986, 42 (05): : 76 - 85
  • [35] AUTOMATED ANTENNA TESTS SAVE TIME AND CUT COSTS.
    Ronnenburg, Charles H.
    Trapp, Robert L.
    Microwaves New York, N.Y., 1980, 19 (01): : 66 - 72
  • [36] HOW TO CUT DOWN ON CUTOFF BAND MACHINING COSTS.
    McMahon, Jim
    Allen, Dave
    Slattery, Tom
    Machine and tool blue book, 1982, 77 (02): : 80 - 89
  • [37] EXTRA INSTRUMENTATION CAN CUT COMPRESSOR OPERATING COSTS.
    Robson, N.H.
    1600, (38):
  • [38] USING SUPERPLASTIC ALLOYS TO CUT CAVITY MOULD COSTS.
    Anon
    Production Engineer London, 1983, 62 (03): : 13 - 14
  • [39] CHANNEL DESIGN TO MINIMIZE LINING MATERIAL COSTS.
    Trout, Thomas J.
    Journal of the Irrigation and Drainage Division, 1982, 108 (IR4): : 242 - 249
  • [40] POWER-LINE MONITORS CUT ELECTRIC POWER COSTS.
    West, Daniel T.
    1978, 20 (12): : 38 - 40