共 50 条
- [32] Current Carrying Capacity of Buried Power Cables Subjected to Alternating Loads - 1, 2. Elektrie, 1974, 28 (02): : 103 - 107
- [36] UPGRADE OF WESTINGHOUSE STEAM GENERATOR FACILITY (GPL-1/SWL-2) TO 2. 0 MEGAWATT. Proceedings of the Annual Reliability and Maintainability Symposium, 1980, 2 : 31 - 21